WednesdayOld
Codgers Club - 9.00am until the pub opens
Current
work/project list - Feel free to pick any job up!!!
For
Members info only
PROJECT |
STATUS |
General |
|
Replace the bridge handrail and damaged
treads (treads on site)
|
In
Hand |
| Repaint
station hand rails, lamp standard, signal gantry
and crossing gates. |
Open |
| Complete
painting the signal box |
In
hand |
| Treat
woodwork on club house, mower shed and workshop |
Open |
| Repaint
Cowdry halt |
Open |
| Clean
out water tanks which are used to supply water
to the engines. Clean and repair station water
supply guttering |
Open |
| Move
steaming bay water tank and set up guttering |
Open |
| Repaint
track bridges. Three to do |
In
Hand |
| Steaming bay plastic
roof to be replaced |
Open |
| |
|
| Club
House |
STATUS |
| The
club house concrete haunches around the wall
base are in a poor state of repair and require
cutting out and replacing. |
Open |
| Repair
the ceiling tiles and clean the clear tiles |
Open |
| Entrance
door and panels to be replaced. Decoration to
be made after work completed. |
Open |
| |
|
|
Grounds
Maintenance |
STATUS |
|
Mowing and Strimming |
Open |
Weed
Killing |
Open |
Cutting
back trees and undergrowth |
Open |
Maintain
wood fence around the site(bowling green and
others) |
Open |
|
|
Track
Maintenance |
STATUS |
20
x 16 ft lengths’of track to be replaced
to raise the track off the concrete to simplify
future track maintenance. This will be an
annual requirement until complete |
In
Hand |
|
|
On
going work |
STATUS |
Repairs
to trolleys |
Ongoing |
Replace
damaged sleepers, and check track alignment |
Ongoing |
Maintain
trolleys |
Ongoing |
|