Wednesday Working Party...
9.00am until the pub opens
Current work/project list - Feel free to pick any job up!!!
For Members info only
| Replace the bridge handrail and damaged treads (treads on site) | In Hand |
| Complete painting the signal box | In Hand |
| Treat woodwork on club house, mower shed and workshop | Open |
| Repaint Cowdry halt | Open |
| Clean out water tanks which are used to supply water to the engines. Clean and repair station water supply guttering | Open |
| Move steaming bay water tank and set up guttering | Open |
| Repaint track bridges. Three to do | In Hand |
| Steaming bay plastic roof to be replaced | Open |
| The club house concrete haunches around the wall base are in a poor state of repair and require cutting out and replacing. | Open |
| Repair the ceiling tiles and clean the clear tiles | Open |
| Entrance door and panels to be replaced. Decoration to be made after work completed. | Open |
| Mowing and Strimming | Open |
| Weed Killing | Open |
| Cutting back trees and undergrowth | Open |
| Maintain wood fence around the site(bowling green and others) | Open |
| 20 x 16 ft lengths’of track to be replaced to raise the track off the concrete to simplify future track maintenance. This will be an annual requirement until complete | In Hand |
| Repairs to trolleys | In Hand |
| Replace damaged sleepers, and check track alignment | In Hand |
| Maintain trolleys | In Hand |