Speedy Diesel Schools

Wednesday Working Party...

9.00am until the pub opens

Current work/project list - Feel free to pick any job up!!!

For Members info only

General TasksStatus
Replace the bridge handrail and damaged treads (treads on site)In Hand
Complete painting the signal boxIn Hand
Treat woodwork on club house, mower shed and workshopOpen
Repaint Cowdry haltOpen
Clean out water tanks which are used to supply water to the engines. Clean and repair station water supply gutteringOpen
Move steaming bay water tank and set up gutteringOpen
Repaint track bridges. Three to doIn Hand
Steaming bay plastic roof to be replacedOpen
Club HouseStatus
The club house concrete haunches around the wall base are in a poor state of repair and require cutting out and replacing.Open
Repair the ceiling tiles and clean the clear tilesOpen
Entrance door and panels to be replaced. Decoration to be made after work completed.Open
Grounds MaintenanceStatus
Mowing and StrimmingOpen
Weed KillingOpen
Cutting back trees and undergrowthOpen
Maintain wood fence around the site(bowling green and others)Open
Track MaintenanceStatus
20 x 16 ft lengths’of track to be replaced to raise the track off the concrete to simplify future track maintenance. This will be an annual requirement until completeIn Hand
On going workStatus
Repairs to trolleysIn Hand
Replace damaged sleepers, and check track alignmentIn Hand
Maintain trolleysIn Hand